Tunnel Sozina in Montenegro Serves 1.44 Million Vehicles

Tunnel Sozina in Montenegro has seen a significant traffic flow this year, serving nearly 1.44 million vehicles

Tunnel Sozina in Montenegro has served nearly 1.44 million vehicles since the beginning of the year, according to data from Monteput, the operator of the tunnel. 

Last year, the tunnel saw 3.52 million vehicles pass through, compared to 3.07 million in 2022 and 2.61 million in 2021

Opened in July 2005, Tunnel Sozina cost approximately €74 million to construct, with Montenegro providing €50 million and the remaining €24 million funded by a loan from the European Investment Bank (EIB).

Stretching 4.19 kilometers, the tunnel connects Montenegro’s coastal region with its central area.

Have a news tip or story to share? Email us at info@connectingregion.com

Photo sourcemonteput.me

Humanoid Robots Made in Serbia

Chinese manufacturers Minth and AGIBOT have launched humanoid robot production in Šabac, opening a new chapter for Serbia's industrial...

Croatian Self-Driving Cars Take to British Roads

From Zagreb to Manchester, Croatian mobility company Verne is helping bring autonomous taxis to European streets, challenging the assumption...

Adria’s Invisible Global Footprint

From the technology behind global communications to medicines, automotive engineering and digital worlds, the seven countries of Adria have...

The Next Test for Mate Rimac

The Croatian entrepreneur built a global reputation by challenging the automotive establishment. Now, with Porsche departing, BMW adopting his...

Beyond the AI Hype

Who's Actually Building the Adria Region's AI Economy? From cancer diagnostics and digital identity to industrial engineering and creative automation,...
spot_img

Connecting the Adria Region Decision Makers

The Region is more than a publication - it's where the region's elite converge for insights and opportunities